SORTATION SLIDING SHOE SORTER

9.1-3 Contact Customer Care at 1.844.4HYTROL

PROSORT 1121 & 1131

Spur Alignment 11" Downstream for ProSort 1121 4-1/2" Downstream for ProSort 1131

1/4" TO 2-1/4"

22 OR 30 (22 SHOWN)

SPUR DETAIL VIEW (SOME DETAILS REMOVED FOR CLARITY)

8

1 8

4

1 8

INDUCTION BED WIDTH

BR OAW

22 OR 30 (22 SHOWN)

WHEN SPURS ARE USED, MINIMUM IS EITHER SPUR LENGTH ALONG SORTER OR DIVERT LENGTH, WHICHEVER IS LONGER

5

3 8

CONVEYING SURFACE

SHAFT MOUNTED GEARMOTOR

FLOW

SHOE ASSEMBLY SLAT ASSEMBLY 8" DIA DRIVE PULLEY 2-1/4" DIA TAIL ROLLER HEAVY DUTY CHAIN COVER NOTE: SPUR WIDTH AT LEAST 4" WIDER THAN INDUCTION CONVEYOR (WHEN SPURS ARE USED) INDUCTION CONVEYOR TIMING BELT DRIVEN INDUCT

INDUCTION LENGTH SORTER LENGTH

6

7 8

19

1 8

18

1 2

TAKEUP

18

5 8

46" TAIL

30" OF TAIL IN SORTER

DIVERT SECTION LENGTH INTERMEDIATE SECTION DIVERT SECTION LENGTH

48" DRIVE

30 5/8" UP TO 210 FT 42 5/8" FOR 210'1" TO 500'0" (LENGTH DEPENDENT)

78" FOR UP TO 210 FT 90" FOR 210'1" TO 500'0" (SORTER LENGTH DEPENDENT)

2-1/4" DIA ROLLER

FLOW

6" DIA TAKEUP PULLEY CATENARY SWITCH ASSEMBLY OPTIONAL HS SUPPORT SHOWN

Note: Spur location is measured beyond the end of the section on both the 22-degree and the 30-degree diverts.

Previous Page
Next Page